SoundSafe.ai
OmniusGrid by SoundSafe.ai

The correlation engine for Industry 4.0.

It takes the files a factory already has — ERP orders, invoices, shipments, quality records — and the machine data it already streams, and makes them answer questions together. In plain language, with a score, the reasoning shown and a one-click action.

Sales just called. Big rush order. Can we take it?

Documents only to start. No machine access, no network change.
Galena & Chicago, Illinois · Dubuque, Iowa

OmniusGrid · Correlation AI live
XLSXmaterial-forecast_q3.xlsx PDFcarrier-agreement_2026.pdf ERPSAP · work orders LIVELines 1–3 stream
What happens if we raise Line 3 output by 20%?
Working through the analysis
Reasoning — ingested files × live machine data
GO · 91
Line 3 absorbs +20% without a new bottleneck — materials hold through Q3, freight is already contracted, and Lines 1–2 cover the changeover dip. Green-light it.
Green-light +20% on Line 3 Kanban task → Purchasing ✓ dispatched
Ask anything about this plant…
Drop in the files you already have. Ask in plain language.
One question, three places it lives

Each source is perfectly legible on its own.
Together, they've never met.

Purchasing
material-forecast_q3.xlsx
Steel and bearing replenishment holds a +20% draw through Q3.
Logistics
carrier-agreement_2026.pdf
Two extra outbound loads per week, already covered at contract rate.
Machines · live
Lines 1–3 stream
Line 3 at 63% load — Lines 1–2 have room for the changeover dip.

The answer: yes — and here's the headroom

Three sources resolved into one capacity picture.

Line 3 — capacity checklive
● LIVELine 363% load
+20% headroom
Materials hold through Q3 · freight already contracted · Lines 1–2 cover the changeover dip
Capacity found, not bought. The answer was already inside the plant.
What it actually looks like

No abstract dashboards.
These are the panes you'd work in.

See what's wrong, right now

Alarms arrive tied to the machine that raised them — not as a code you look up.

Active Alarmslive
criticalDie protection tripped on misfeedStamping Press #1 · DIE_PROTECTION_TRIP
highWire feed stalled — cell heldWelding Cell #1 · WIRE_FEED_FAULT
mediumDischarge temperature above thresholdAir Compressor #1 · DISCHARGE_TEMP_HIGH
lowSpindle bearing temperature elevatedCNC Mill #1 · SPINDLE_WARN

Fix it without typing a ticket

The work order writes itself from the answer, then goes to a named person.

Operations Board
In Progress3
WIP Limit3 / 5
Corrective Maint. (1)
Replace spindle bearing kit (WO-4482)
CorrectiveOverdueAsset
SAP work order WO-4482 — bearing kit BOM-2231, Line 3 CNC spindle
Progress35%
DADev Admin ◷ 1h 30m Jul 10 💬 4
Assign to
DADev AdminOperations
ROR. OkaforMaintenance
SLS. LindqvistQuality
WO-4482 assigned to R. Okafor — Maintenance
One approval — the floor and Purchasing move together.

Know what to do about it

Every answer arrives with the next steps attached, waiting on one approval.

Recommended Actions
Actionable insight — one click
Release the +20% schedule to Line 3 from Monday
Raise steel replenishment to the Q3 forecast draw
Add two outbound loads per week at contract rate
Pull SAP bearing kit BOM-2231 for WO-4482
Causal confidence 0.0 — association shown, causation not claimed.
Supervisor approval required before anything dispatches.

Catch the cost while you can still stop it

Detention is flagged in the yard, not discovered on next month's invoice.

Yard Managementlive
TRL-2291 · Dock 4
arrived 06:12 · free time expired 09:12
$325
TRL-1180 · Dock 7
arrived 07:40 · free time expires in 22m
$200
TRL-3007 · Dock 2
released 08:55 · within free time
$0
Trailers at risk
2
Detention exposure$
$525

Dashboards tell you what happened.
An operator needs to know what to do next.

So every answer carries a score, the rows it was built from, and an action somebody can approve — not a chart to interpret at the Monday meeting.

Two products, two budget lines

One engine discipline,
sold to two different people in your building.

They're better together and neither one needs the other. Buy either on its own.

Flagship
OmniusGrid
Bought by operations
Answers: can this site take the order, and what breaks first if it does
  • Correlates spreadsheets, PDFs and ERP records into one picture of the plant.
  • Eight live ERP integrations, SAP through QuickBooks. Enterprise data leads; machines follow.
  • 1,349 equipment families across 513 manufacturers, every one integration-graded.
  • Answers carry source, table and row lineage. A supervisor approves before the floor moves.
Separate product

The Security Layer

Bought by security & EHS
Answers: what just happened, and across how many of our sites
  • Runs on the cameras and VMS you already own — Genetec or Milestone — instead of replacing them.
  • PPE compliance, safe human-machine interaction and restricted-zone monitoring first.
  • Resolves every feed at a site into one incident, then correlates across the whole estate.
  • Hash-chained audit trail, built for an insurance claim or a records request.
Why you can act on the answer

Evidence, not alerts.

It shows its work

Source, table and row lineage on every correlation — the exact join key, the records that matched, and the records that didn't.

It refuses to guess

Ask it for a cause and it returns a causal confidence of 0.0 with an explicit guardrail. That's a property of the output, not fine print.

A human stays in the loop

Operational change requires supervisor approval, and action assessment fails closed. When it isn't sure, nothing moves.

The record is tamper-evident

A hash-chained audit trail, chained per organisation, so what the system concluded and when survives outside scrutiny.

Frictionless integration

Nothing gets ripped out.
Nothing new goes on the line.

The hardest part of industrial software is usually the installation. We removed it from the front of the process. OmniusGrid starts with the files your plant already produces — so the first answer arrives before anyone touches a machine, opens a port, or schedules downtime.

No machine access to begin

Documents and ERP records only. No network change, no PLC work, no downtime window, no IT review to clear first.

Your ERP, not ours

Eight live integrations, SAP through QuickBooks. It reads what you already run rather than asking you to move to a new system.

Nothing to standardise first

A press from the nineties and a cell installed last quarter arrive on the same collector base class. You don't have to make the floor uniform before you get an answer.

It runs above your VMS

Genetec or Milestone stay exactly where they are. Correlating across the camera estate is the job — displacing it isn't.

1,349equipment families, every one integration-graded
513manufacturers across the catalogue
23protocol collectors, plus eight live ERP integrations

Already integration-graded, among others:

SiemensFanucRockwell / Allen-BradleyHaasMitsubishiDMG MORIABBKUKAOmronSchneider ElectricBeckhoffMazakTrumpfSICKYaskawa MotomanOkumaKeyenceBosch RexrothAtlas CopcoHeidenhainMakinoEngelArburg+ 489 more
Why Midwest matters

Being nearby is a service commitment,
not a biographical detail.

30.5% of America's mid-market manufacturing sites sit in our eight states, and every one of them is inside a day's drive — which is what keeps site surveys and calibration economical rather than a line item. We expand outward from that core, not by planting a flag on a coast and hoping the service radius stretches.

Where we are, and where this goes
The eight states we serve today form one contiguous block, and every site in it is inside a day’s drive.
AlabamaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyomingAlaskaHawaiiILINIAMIMNMOOHWIAKHI
Eight states today — 11,485 mid-market sites, all inside a day's drive
The adjacent corridor — next, while proximity still holds
Coast to coast — once density supports standing service, not before
Mid-market manufacturing sites, by state
Establishments at enterprises of 50–499 employees, NAICS 31–33
Ohio2,258
Michigan1,978
Illinois1,836
Wisconsin1,694
Indiana1,326
Minnesota991
Missouri811
Iowa591
Eight states11,485
Source: US Census Bureau, Statistics of U.S. Businesses, 2022, released 10 April 2025. Establishment counts rather than firm counts, because we sell per site. The final row is the eight-state total, drawn to its own full width.
Start here

Bring one question your floor can't answer today.

Not a requirements document and not a procurement process — one real question, the kind that currently takes a meeting or a week. Thirty minutes is usually enough to show you whether the answer was already sitting in your own files.